A bill to authorize certain elements of the Yakima River Basin Water Enhancement Project, and for other purposes.

1/1
Status In Committee
Sponsor Sidney Morrison
Citation 99-HR-4947
Actions 3
Introduced Jun 5th, 1986
Cosponsors
Last Action Aug 19th, 1986
Policy Area
Introduced House Jun 5
House
Senate
President
Enacted

Summary

AI Guide

What this bill does

Loading AI analysis…

Authorizes the Secretary of the Interior to design, construct, operate, and maintain the following features of the Yakima Enhancement Project: (1) modification of existing radial gates at Cle Elum Dam; (2) a Kachess Lake to Keechelus Lake pipeline; (3) a reregulating reservoir of the Roza Division; and (4) facilities to automate and otherwise improve canal operations of the Sunnyside Division and the Wapato Indian Project. Authorizes appropriations. Requires non-Federal interests to fund 35 percent of construction costs. Authorizes appropriations to the Secretary for a feasibility study of certain other potential elements of the Yakima Enhancement Project.

Actions

3
House
INTRODUCED
INTRODUCED
Jun 5, 1986
ON FLOOR
REFERRED TO COMMITTEE
COMMITTEE
REFERRED TO SUBCOMMITTEE
Aug 19, 1986
Font size

No Bill Text yet Available

Text for this piece of legislation has not yet been uploaded — check back in a few days.